internal:proddocs:3271
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| internal:proddocs:3271 [2022/02/21 15:15] – chrissy | internal:proddocs:3271 [2025/08/29 10:54] (current) – david | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== 3271 Build Instructions ====== | ====== 3271 Build Instructions ====== | ||
| - | <note warning> | + | |
| + | <note warning>**The 3271 PCB assembly contains components that are sensitive to electrostatic discharge (ESD) – please make sure you are wearing your wrist strap when handling.**</ | ||
| **Tools: | **Tools: | ||
| Line 9: | Line 10: | ||
| **Method:** | **Method:** | ||
| - | <note important> | + | <note important> |
| - | < | + | < |
| **Fit 200581 Grommet to Fuel Sender Body as shown ensuring correct seating.** | **Fit 200581 Grommet to Fuel Sender Body as shown ensuring correct seating.** | ||
| + | |||
| {{: | {{: | ||
| - | <note important> | + | <note important> |
| {{: | {{: | ||
| ** Ease the cable back through the grommet to centralise the PCB Assembly in the sender Body, making sure the LED and Tank Instance dial are on top of the PCB.** | ** Ease the cable back through the grommet to centralise the PCB Assembly in the sender Body, making sure the LED and Tank Instance dial are on top of the PCB.** | ||
| - | **Hold a magnet over reed switch SW1. Connect to Bench Power Supply. Ensure that voltage is set between 12.8 and 13.8 volts. | + | **Connect to Bench Power Supply. Ensure that voltage is set between 12.8 and 13.8 volts.** |
| {{: | {{: | ||
| - | < | + | |
| + | < | ||
| ====== Programming ====== | ====== Programming ====== | ||
| - | * **Connect to Atmel Flip system version 2.4.6. | + | < |
| + | Connect the ST/LINK v2 to the programming header. You will need the PCB to be loose from the sender head to be able to access it, as it is on the under-side of the board. | ||
| + | Open STM32CubeProgrammer | ||
| + | Click the Icon on the left hand side:**** 5) Click the connect button.**</ | ||
| - | * Select Menu then the file marked 3271vxxx.hex. | ||
| - | * Check it has the latest version software on S\Code\Software version matrix. | + | {{: |
| - | * Click on USB plug Icon at top of menu from this select PEEK, from this Menu Click Initiate then node connect.** | ||
| - | {{: | ||
| - | **. Un-tick box marked BLJB. Click Run this will load the software | + | **Browse to the folder S: |
| + | Then select 3271bootloader.bin** | ||
| + | |||
| + | |||
| + | {{: | ||
| + | |||
| + | **Ensure the check boxes are as shown below and then select “Start Programming”** | ||
| + | |||
| + | {{: | ||
| + | |||
| + | |||
| + | **Now, the blue LED should be on solid. | ||
| + | <note important> | ||
| + | |||
| + | {{: | ||
| + | |||
| + | **Press the “reprogram” button** | ||
| + | |||
| + | {{: | ||
| + | |||
| + | **Navigate to S: | ||
| + | ** | ||
| + | |||
| + | {{: | ||
| + | |||
| + | |||
| + | **The tool will now indicate it is programming, | ||
| + | |||
| + | {{: | ||
| - | {{: | ||
| **Clean the rods using Amber clean paying attention to the threaded area | **Clean the rods using Amber clean paying attention to the threaded area | ||
| Line 44: | Line 74: | ||
| < | < | ||
| - | **Assemble the Insulator mouldings to the Probe. Check the un-threaded end of the probe for burrs and de-burr if necessary. Slide 200622 Insulators onto the Probe, spacing them approximately 200 mm apart.** | + | **Assemble the Insulator mouldings to the Probe. Check the un-threaded end of the probe for burrs and de-burr if necessary. Slide 200622 Insulators onto the Probe, spacing them approximately 200 mm apart. |
| + | ** | ||
| + | <note important> | ||
| + | **</ | ||
| <note important> | <note important> | ||
| Line 51: | Line 83: | ||
| **The threaded end of the Probe is now inserted into the centre hole in the threaded end of the Sender Body until the thread protrudes through the centre hole in the PCB.** | **The threaded end of the Probe is now inserted into the centre hole in the threaded end of the Sender Body until the thread protrudes through the centre hole in the PCB.** | ||
| - | <note important> | + | <note important> |
| **Ensure there are no burrs on the edges of the tube and that the inside is clean; now assemble 200738 Outer Tube carefully over the Insulators. The tube must be inserted into the body to the bottom of the hole.** | **Ensure there are no burrs on the edges of the tube and that the inside is clean; now assemble 200738 Outer Tube carefully over the Insulators. The tube must be inserted into the body to the bottom of the hole.** | ||
| - | <note tip>The 2 black 200812 M6 Grub Screws are screwed into the Tube retaining holes in the main thread. Check that the Tube is still pushed fully home, tighten Screws to 1.5Nm. | + | <note tip>**The 2 black 200812 M6 Grub Screws are screwed into the Tube retaining holes in the main thread. Check that the Tube is still pushed fully home, tighten Screws to 1.5Nm. |
| - | Repeat this operation with the 2 Silver 200813 Grub Screws using them to lock the black screws in position. Once tightened, ensure one final 200622 insulator is pushed on to the end of the rod (approx 5mm into the tube) to prevent the risk of shorting. | + | Repeat this operation with the 2 Silver 200813 Grub Screws using them to lock the black screws in position. Once tightened, ensure one final 200622 insulator is pushed on to the end of the rod (approx 5mm into the tube) to prevent the risk of shorting.** |
| </ | </ | ||
| {{: | {{: | ||
| - | DO FUNCTIONAL TEST PRIOR TO POTTING PROCEDURE. | ||
| - | | + | **DO FUNCTIONAL TEST PRIOR TO POTTING PROCEDURE.** |
| - | - VERIFY SOFTWARE IS LOADED USING “GETPRODINFO” | + | |
| - | - ENSURE MODEL ID AND SOFTWARE VERSION ARE CORRECT | + | |
| + | - **VERIFY SOFTWARE IS LOADED USING “GETPRODINFO”** | ||
| + | - **ENSURE MODEL ID AND SOFTWARE VERSION ARE CORRECT** | ||
| + | - **CLICK GET CAL AND ENSURE CURRENT MEASURED VALUE DOES NOT READ AS 0** | ||
| + | |||
| + | ====== Process ====== | ||
| + | |||
| + | <note important> | ||
| + | |||
| + | ** -Turn on PSU power and plug in the sender.** | ||
| + | - **Open Monex 3.12** | ||
| + | - **Holding the cable, do an E cal** | ||
| + | -** Do an F cal, this will change on the INST** | ||
| + | |||
| + | **Check the Blue light is flashing every 2.5 seconds** | ||
| **Before potting, allow the senders to acclimatise in the potting room for a couple of hours. This will reduce the chance of any condensation on the inner sender body. | **Before potting, allow the senders to acclimatise in the potting room for a couple of hours. This will reduce the chance of any condensation on the inner sender body. | ||
| - | 13. Suitable PPE should be worn when using the two-part Epoxy potting compound. | + | ** |
| + | **Suitable PPE should be worn when using the two-part Epoxy potting compound. | ||
| Warm the compound in the water bath (this should be set to 40 degrees), this takes approximately 10 minutes for the bath to come up to temperature and 5 minutes to warm a bag of compound. Do not warm above this temperature as it will greatly reduce the pot life of the compound. | Warm the compound in the water bath (this should be set to 40 degrees), this takes approximately 10 minutes for the bath to come up to temperature and 5 minutes to warm a bag of compound. Do not warm above this temperature as it will greatly reduce the pot life of the compound. | ||
| Once warm, work the black potting BEFORE removing the clip and rail – this will help remove any lumps caused by the fillers that have settled over time. Then, place back into the bath for 2 minutes. | Once warm, work the black potting BEFORE removing the clip and rail – this will help remove any lumps caused by the fillers that have settled over time. Then, place back into the bath for 2 minutes. | ||
| - | Remove the clip and rail, and mix thoroughly for approximately 2 minutes. | + | Remove the clip and rail, and mix thoroughly for approximately 2 minutes.** |
| - | ** | + | |
| {{: | {{: | ||
| - | <note important> | + | |
| - | **To avoid air gaps under the PCB and around the wiring, the sender must be at a slight angle – a cotton bud under one side is enough. | + | **REMEMBER TO TURN THE WATER BATH OFF ONCE YOU HAVE FINISHED WITH IT ! |
| + | To avoid air gaps under the PCB and around the wiring, the sender must be at a slight angle – a cotton bud under one side is enough. | ||
| The compound can then be slowly poured into the lower side, as this allows the potting to fill up level with the board and prevents air pockets. | The compound can then be slowly poured into the lower side, as this allows the potting to fill up level with the board and prevents air pockets. | ||
| Once all air has been removed under the board, you should see a ring of potting all around the outside of the PCB. | Once all air has been removed under the board, you should see a ring of potting all around the outside of the PCB. | ||
| Line 85: | Line 133: | ||
| At this point, the cotton buds can be removed so the sender is now flat and the sender can be topped up. | At this point, the cotton buds can be removed so the sender is now flat and the sender can be topped up. | ||
| - | If any bubbles appear, these can be dispersed by gently using a hot air gun over the surface.** | + | If any bubbles appear, these can be dispersed by gently using a hot air gun over the surface. |
| + | |||
| + | The Potting must now be left overnight to | ||
| + | Cure and harden.** | ||
| + | |||
| + | **No epoxy to be visible on the switch and overspill is to be wiped away. Epoxy must be flush to metal surface to avoid creating a recess for any fluid to accumulate when in use.** | ||
| - | **The Potting must now be left overnight to | ||
| - | Cure and harden. | ||
| - | ** | ||
| - | <note important> | ||
| {{: | {{: | ||
| + | |||
| **Once the Potting has set, the Serial No Label 200303 can be applied. Position symmetrically as shown. The label MUST NOT overlap the switch, LED or metal edges of the body.** | **Once the Potting has set, the Serial No Label 200303 can be applied. Position symmetrically as shown. The label MUST NOT overlap the switch, LED or metal edges of the body.** | ||
| + | |||
| {{: | {{: | ||
| - | **. Now connect the unit to the Monex system and assign the unit the serial number from the sticker and to do a final test after assembly to make sure the unit is still fully functioning and has not been damaged during the build procedure. | ||
| - | Click SET SERIAL – input the serial number from the label | + | **Now connect the unit to the Monex system and assign the unit the serial number from the sticker and to do a final test after assembly to make sure the unit is still fully functioning and has not been damaged during the build procedure. |
| + | **Click SET SERIAL – input the serial number from the label | ||
| + | ** | ||
| Click GET PRODUCT INFO to confirm Serial Number and software level | Click GET PRODUCT INFO to confirm Serial Number and software level | ||
| ** | ** | ||
| - | <note important> | + | <note important> |
| - | Only test on empty and full.</ | + | Only test on empty and full.**</ |
| {{: | {{: | ||
| + | |||
| **. To Calibrate Sender to empty out of the tank suspended vertically only holding on to the cable. | **. To Calibrate Sender to empty out of the tank suspended vertically only holding on to the cable. | ||
| Line 114: | Line 168: | ||
| ** | ** | ||
| - | {{: | + | {{: |
| **With a magnet locate the re calibration place on the top of the unit labelled MAGNET and you will see the blue led remain lit for 2.5seconds (you can repeat this as many times as you like until you are happy that you have set the EMPTY position. | **With a magnet locate the re calibration place on the top of the unit labelled MAGNET and you will see the blue led remain lit for 2.5seconds (you can repeat this as many times as you like until you are happy that you have set the EMPTY position. | ||
| Line 121: | Line 176: | ||
| ** | ** | ||
| - | {{: | + | {{: |
| **To calibrate sender to full, turn rotary switch to the ‘F’ position as indicated in the diagram. | **To calibrate sender to full, turn rotary switch to the ‘F’ position as indicated in the diagram. | ||
| - | The sender must be dipped into the tube of fuel to where, the fuel must reach the bottom of the threaded part of the sender body – ensure that the tube has sufficient fuel to reach this level. | + | The sender must be dipped into the tube of fuel to where, the fuel must reach the bottom of the threaded part of the sender body – ensure that the tube has sufficient fuel to reach this level. |
| Now as for the empty calibration. With a magnet locate the re-calibration place on the top of the unit labelled MAGNET and you will see the blue led remain lit for 2.5 seconds (you can repeat this as many times as you like until you are happy that you have set the FULL position). | Now as for the empty calibration. With a magnet locate the re-calibration place on the top of the unit labelled MAGNET and you will see the blue led remain lit for 2.5 seconds (you can repeat this as many times as you like until you are happy that you have set the FULL position). | ||
| Line 131: | Line 187: | ||
| This is checked with the GET CAL box which should display the FULL values.** | This is checked with the GET CAL box which should display the FULL values.** | ||
| - | {{: | + | {{: |
| **With calibration complete the rotary dial switch must now be returned to the required instance (0 for a single tank installation). Position as shown in the diagram. | **With calibration complete the rotary dial switch must now be returned to the required instance (0 for a single tank installation). Position as shown in the diagram. | ||
| Line 141: | Line 198: | ||
| Affix the Label squarely to the flats on Sender Body. | Affix the Label squarely to the flats on Sender Body. | ||
| ** | ** | ||
| + | |||
| {{: | {{: | ||
| + | |||
| + | <note important> | ||
| + | |||
| **The Sender is now ready for packing. The user instructions are packed into Poly Bag 200332 along with 1 off Insulator 200602. | **The Sender is now ready for packing. The user instructions are packed into Poly Bag 200332 along with 1 off Insulator 200602. | ||
| Line 166: | Line 227: | ||
| --- // | --- // | ||
| + | --- // | ||
internal/proddocs/3271.1645456531.txt.gz · Last modified: 2023/07/12 14:11 (external edit)