User Tools

Site Tools


internal:proddocs:5180

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
internal:proddocs:5180 [2022/04/11 14:07] chrissyinternal:proddocs:5180 [2023/09/26 12:12] (current) ryan
Line 23: Line 23:
 {{:internal:proddocs:5180.3.png?600|}} {{:internal:proddocs:5180.3.png?600|}}
  
-{{:internal:proddocs:5180.4.png?600|}}+{{:internal:proddocs:5180....png?600|}}
  
 {{:internal:proddocs:5180.5.png?600|}} {{:internal:proddocs:5180.5.png?600|}}
Line 71: Line 71:
 {{:internal:proddocs:5180.12.png?600|}} {{:internal:proddocs:5180.12.png?600|}}
  
-<note tip>**Ensure jumpers are in desired locations – note, at this point the PCB has NOT been fitted to the case see pics below.**+<note tip>**Ensure jumpers are in desired locations – note, at this point the PCB has NOT been fitted to the case see pics below.**</note>
  
   - **Image 1: 1 jumper**   - **Image 1: 1 jumper**
Line 150: Line 150:
 Note – nut has a flat edge. Note – nut has a flat edge.
 Ensure notch is at the top of M12.**</note> Ensure notch is at the top of M12.**</note>
 +
 +<note important>**CAN CONNECTOR CABLE SOLDERING DIFFERS IF YOU HAVE NEW VERSION OF CAN BOARD. PLEASE CHECK BELOW FOR CHANGES.
 +**</note>
 +
 +{{ :internal:proddocs:4166_can_board_update.jpg?nolink |}}
 +
 +{{ :internal:proddocs:img_20230418_083138.jpg?nolink |}}
  
 **See below pic.** **See below pic.**
Line 191: Line 198:
 Check that the cabling is clear of the heat pipes.**</note> Check that the cabling is clear of the heat pipes.**</note>
  
-**Refit lid using 4 x screws removed earlier. Ensure hands are clean of heat sink compound before doing this, to avoid getting smears on unit. 
- 
-Take care not to cross thread these screws, and do not over tighten.** 
- 
-**Carefully clean finished box afterwards. 
- 
-Fit green connector to mating half on front plate. 
- 
-Give the unit a gentle shake to ensure there is nothing loose inside – unit is now ready for programming and final test. 
-** 
  
 ====== **Final test** ====== ====== **Final test** ======
Line 298: Line 295:
 The unit will then shut down – add the green connector and box the unit The unit will then shut down – add the green connector and box the unit
 ** **
 +
 +**Refit lid using 4 x screws removed earlier. Ensure hands are clean of heat sink compound before doing this, to avoid getting smears on unit.
 +
 +Take care not to cross thread these screws, and do not over tighten.**
 +
 +**Carefully clean finished box afterwards.
 +
 +Fit green connector to mating half on front plate.
 +
 +Give the unit a gentle shake to ensure there is nothing loose inside. 
 +**
 +
 +{{:internal:proddocs:5180.38.png?600|}}
 +
 +
 +**Fit the void sticker.
 +
 +Pack into the box the unit was originally supplied in see pic below.**
 +
 +<note important>Ensure the power connector 203134 is FITTED before packing</note>
  
  
 +{{:internal:proddocs:5180.39.png?600|}}
internal/proddocs/5180.1649686061.txt.gz · Last modified: 2023/07/12 14:11 (external edit)

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki