| <note warning> The 5250 PCB assembly contains components that are sensitive to electrostatic discharge (ESD) – please make sure you are wearing your wrist strap when handling.</ | <note warning> The 5250 PCB assembly contains components that are sensitive to electrostatic discharge (ESD) – please make sure you are wearing your wrist strap when handling.</ | ||
| - | <note important> | + | |
| ===== Atmel Programming ===== | ===== Atmel Programming ===== | ||
| Line 29: | Line 29: | ||
| - Load the latest 5250 named hex file from S:/ | - Load the latest 5250 named hex file from S:/ | ||
| - Press Run | - Press Run | ||
| + | |||
| + | <adm warning> | ||
| + | |||
| + | {{: | ||
| ===== Hardware Assembly ===== | ===== Hardware Assembly ===== | ||
| - | {{: | + | Bezel casting 202272 and |
| + | gasket 202510. | ||
| + | |||
| + | Clean the front face of the bezel with a soft clean cloth, then cover with blue tape. | ||
| + | |||
| + | Remove backing from gasket to expose self adhesive side, with care, place self adhesive side of gasket into bezel, making sure correct orientation of gasket. | ||
| + | |||
| + | {{: | ||
| Rest printed glass (202271) onto the gasket, making sure correct orientation of glass and bezel casting. | Rest printed glass (202271) onto the gasket, making sure correct orientation of glass and bezel casting. | ||
| Line 40: | Line 51: | ||
| Degrease polyacetal body with IPA and allow to dry before fitting. | Degrease polyacetal body with IPA and allow to dry before fitting. | ||
| - | Place black polyacetal body into bezel casting | + | Place black polyacetal body into bezel casting. Make sure that the body is correctly aligned. |
| <adm warning> | <adm warning> | ||
| Line 48: | Line 59: | ||
| Use hand press to snap black body into place, make sure to protect the body from damage. See next image. | Use hand press to snap black body into place, make sure to protect the body from damage. See next image. | ||
| - | {{: | + | {{: |
| + | |||
| + | {{: | ||
| Protect black plastic body. | Protect black plastic body. | ||
| Line 54: | Line 67: | ||
| Remove rubber grommet from connector. | Remove rubber grommet from connector. | ||
| - | {{: | + | {{: |
| <note important> | <note important> | ||
| Please ensure potting room is at the temperature 20-25 degrees Celsius. Heater and dehumidifier must be left on at all times (Check Thermometer before starting procedure.)</ | Please ensure potting room is at the temperature 20-25 degrees Celsius. Heater and dehumidifier must be left on at all times (Check Thermometer before starting procedure.)</ | ||
| - | <adm warning> | + | <adm warning> |
| - | Pour clear gel (WACKER SILGEL) first - Wacker is 50/50 2 part solution, weigh into cup and then follow document Epoxy degassing instructions QMF18 on how to degas the epoxy. Check all air bubbles have dispersed. | + | Pour clear gel (WACKER SILGEL) first - with mixing ratio 1.5/1 (Compaund A/B), weigh into cup and then follow document Epoxy degassing instructions QMF18 on how to degas the epoxy. Check all air bubbles have dispersed. |
| + | |||
| + | Mixing Table | ||
| + | Compound A - Compound B | ||
| + | |||
| + | Measure the Quantity of **A** 1st, then add enough **B** to make the total required | ||
| + | |||
| + | * 5gr - 3gr | ||
| + | * 6gr - 4gr | ||
| + | * 15gr - 10gr | ||
| + | * 30gr - 20gr | ||
| + | * 45gr - 30gr | ||
| + | * 54gr - 36gr | ||
| + | * 60gr - 40gr | ||
| + | |||
| <adm note>MIX CLEAR POTTING FOR 60 SECONDS</ | <adm note>MIX CLEAR POTTING FOR 60 SECONDS</ | ||
| {{: | {{: | ||
| + | |||
| + | <adm warning> | ||
| Following Clear epoxy procedures 201266 | Following Clear epoxy procedures 201266 | ||
| + | |||
| + | * PUT THE MIXED EPOXY INSIDE THE VACUUM CHAMBER. | ||
| + | * FIRST VALVE MUST BE CLOSE AND SECOND VALVE MUST BE OPEN. | ||
| + | * TURN ON THE COMPRESSOR AND WAIT UNTIL PRESSURE GAUGE BEING STABLE AND COUNT UP TO 40 SEC. | ||
| + | * TURN OFF THE COMPRESSOR AND CLOSE THE SECOND VALVE (CLOSEST TO THE COMPRESSOR) | ||
| + | * OPEN THE FIRST VALVE JUST A LITTLE BIT AND LET THE AIR FLOW INSIDE THE CHAMBER SLOWLY. | ||
| + | * NOW POTTING MATERIAL MUST BE BUBBLE-FREE. | ||
| - | <adm warning> ADD JUST ENUGH TO COVER THE PRINTED GLASS A THIN LAYER. NEVER OVERFILL CLEAR POTTING. </ | + | <adm warning> |
| {{: | {{: | ||
| Line 76: | Line 112: | ||
| {{: | {{: | ||
| - | <note important> | + | <note important> |
| - | {{: | + | {{: |
| + | {{: | ||
| + | {{: | ||
| <note important> | <note important> | ||
| - | {{: | + | {{: |
| When clear epoxy is dry and PCB is securely in place, fill back of Deck Gauge with black epoxy compound 201265. | When clear epoxy is dry and PCB is securely in place, fill back of Deck Gauge with black epoxy compound 201265. | ||
| - | Fill just below the lip of rotary switch taking care not to let potting compound go down into connectors | + | Fill just below the lip of rotary switch taking care not to let potting compound go down into the connector |
| Leave to cure for 24 hrs. | Leave to cure for 24 hrs. | ||
| Line 91: | Line 130: | ||
| switch. | switch. | ||
| - | {{: | + | {{: |
| + | |||
| + | Connect assembly to Monex System to check the function of the display, including checking the dim function. | ||
| + | The serial number label 200304 can now be attached. | ||
| + | The serial number from the label is now assigned to the software – connect to Monex system. | ||
| + | Type the serial number into insert serial no. | ||
| + | Then click SET SERIAL to assign the number to the software. | ||
| + | |||
| + | |||
| + | |||
| + | |||
| + | <note important> | ||
| + | |||
| + | Return the hex nut to connector. | ||
| + | |||
| + | {{: | ||
| + | |||
| + | {{: | ||
| - | connect assembly | + | When packing the Deck Gauge remember |
| - | of the display. | + | |
| - | {{: | + | 3 off screws M4 x 30 raised CSK – 202925. |
| + | 3 off nuts M4 full S/S – 201366. | ||
| + | 3 off washer M4 flat S/S – 201364. | ||
| - | Before packing print Manual and label unit. | + | Ensure that the front of the unit has been polished, and that blue film has been added. |
| - | Return the hex nut to connector, and cover with Blue film. | ||
| - | {{: | + | {{: |
| - | {{: | + | Finished product ready to be shipped. |
| - | {{: | ||