This is an old revision of the document!
Warning: Undefined array key 1 in /data/docs.osukl.com/public_html/lib/plugins/note/syntax.php on line 103
Warning: Undefined array key 1 in /data/docs.osukl.com/public_html/lib/plugins/note/syntax.php on line 103
Warning: Undefined array key 1 in /data/docs.osukl.com/public_html/lib/plugins/note/syntax.php on line 103
Warning: Undefined array key 1 in /data/docs.osukl.com/public_html/lib/plugins/note/syntax.php on line 103
3281 Build Instructions
- - Tools:
- - 5.5mm A/F open end spanner
- - 5.5mm A/F Socket
- - Side Cutters
- - Fine Flat File
- - Soldering Iron
- - Wiha TorqueVario
Method:
Select body required for sender, select Insulating cup (200658) Grommet (200581) see pic below.
Feed Cable Grommet into hole in body side wall now locate the Insulating Cup 200658 into the larger of the two Probe Holes as shown in pic below.
One of the two 200681 probes is insulated with Plastic tube 200901. This is retained in with cable tie 201081 by gripping the end of the tube into the thread. Once assembled the tail of the Cable Tie needs to be cut off, see pic below.
Feed the Cable 200583 through the Grommet and into the sender Body see pic below.
The four wires at the end of the Cable are now carefully soldered to the PCB 10233 in the labelled positioned Black, Blue, Red, White.
The Probe with the plastic tube is now inserted into the Body through the white plastic insulating cup; the other probe is inserted into the remaining probe hole ready for attaching to the PCB assembly. The M3 nuts should have a shake proof washer fitted to them and 6mm of thread protruding prior to assembly with the PCB.




