internal:proddocs:5250
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| internal:proddocs:5250 [2025/05/16 10:32] – david | internal:proddocs:5250 [2025/07/23 08:20] (current) – david | ||
|---|---|---|---|
| Line 30: | Line 30: | ||
| - Press Run | - Press Run | ||
| - | <adm warning> | + | <adm warning> |
| {{: | {{: | ||
| Line 42: | Line 42: | ||
| Remove backing from gasket to expose self adhesive side, with care, place self adhesive side of gasket into bezel, making sure correct orientation of gasket. | Remove backing from gasket to expose self adhesive side, with care, place self adhesive side of gasket into bezel, making sure correct orientation of gasket. | ||
| - | .</ | + | |
| - | {{: | + | {{: |
| Rest printed glass (202271) onto the gasket, making sure correct orientation of glass and bezel casting. | Rest printed glass (202271) onto the gasket, making sure correct orientation of glass and bezel casting. | ||
| Line 59: | Line 59: | ||
| Use hand press to snap black body into place, make sure to protect the body from damage. See next image. | Use hand press to snap black body into place, make sure to protect the body from damage. See next image. | ||
| - | {{: | + | {{: |
| + | |||
| + | {{: | ||
| Protect black plastic body. | Protect black plastic body. | ||
| Line 65: | Line 67: | ||
| Remove rubber grommet from connector. | Remove rubber grommet from connector. | ||
| - | {{: | + | {{: |
| <note important> | <note important> | ||
| Please ensure potting room is at the temperature 20-25 degrees Celsius. Heater and dehumidifier must be left on at all times (Check Thermometer before starting procedure.)</ | Please ensure potting room is at the temperature 20-25 degrees Celsius. Heater and dehumidifier must be left on at all times (Check Thermometer before starting procedure.)</ | ||
| Line 74: | Line 76: | ||
| Mixing Table | Mixing Table | ||
| - | Compaund | + | Compound |
| - | * 1.5gr - 1gr | + | Measure the Quantity of **A** 1st, then add enough **B** to make the total required |
| - | | + | |
| - | * 15gr - 10gr | + | * 5gr - 3gr |
| - | | + | * 6gr |
| - | | + | * 15gr - 10gr |
| - | | + | |
| - | | + | |
| - | | + | |
| + | | ||
| + | |||
| <adm note>MIX CLEAR POTTING FOR 60 SECONDS</ | <adm note>MIX CLEAR POTTING FOR 60 SECONDS</ | ||
| {{: | {{: | ||
| + | |||
| + | <adm warning> | ||
| Following Clear epoxy procedures 201266 | Following Clear epoxy procedures 201266 | ||
| Line 98: | Line 104: | ||
| * NOW POTTING MATERIAL MUST BE BUBBLE-FREE. | * NOW POTTING MATERIAL MUST BE BUBBLE-FREE. | ||
| - | <adm warning> ADD JUST ENUGH TO COVER THE PRINTED GLASS A THIN LAYER. NEVER OVERFILL CLEAR POTTING. </ | + | <adm warning> |
| {{: | {{: | ||
| Line 106: | Line 112: | ||
| {{: | {{: | ||
| - | <note important> | + | <note important> |
| - | {{: | + | {{: |
| + | {{: | ||
| + | {{: | ||
| <note important> | <note important> | ||
| - | {{: | + | {{: |
| When clear epoxy is dry and PCB is securely in place, fill back of Deck Gauge with black epoxy compound 201265. | When clear epoxy is dry and PCB is securely in place, fill back of Deck Gauge with black epoxy compound 201265. | ||
| - | Fill just below the lip of rotary switch taking care not to let potting compound go down into connectors | + | Fill just below the lip of rotary switch taking care not to let potting compound go down into the connector |
| Leave to cure for 24 hrs. | Leave to cure for 24 hrs. | ||
| Line 121: | Line 130: | ||
| switch. | switch. | ||
| - | {{: | + | {{: |
| + | |||
| + | Connect assembly to Monex System to check the function of the display, including checking the dim function. | ||
| + | The serial number label 200304 can now be attached. | ||
| + | The serial number from the label is now assigned to the software – connect to Monex system. | ||
| + | Type the serial number into insert serial no. | ||
| + | Then click SET SERIAL to assign the number to the software. | ||
| + | |||
| + | |||
| + | |||
| + | |||
| + | <note important> | ||
| + | |||
| + | Return the hex nut to connector. | ||
| + | |||
| + | {{: | ||
| - | connect assembly to Monex set serial numbers and double check the function | + | {{: |
| - | of the display. | + | |
| - | {{:internal: | + | When packing the Deck Gauge remember to add a small plastic bag containing |
| - | <adm warning> | + | 3 off screws M4 x 30 raised CSK – 202925. |
| + | 3 off nuts M4 full S/S – 201366. | ||
| + | 3 off washer M4 flat S/S – 201364. | ||
| - | Return | + | Ensure that the front of the unit has been polished, and that blue film has been added. |
| - | {{: | + | {{: |
| - | {{: | + | Finished product ready to be shipped. |
| - | {{: | ||
internal/proddocs/5250.1747391556.txt.gz · Last modified: 2025/05/16 10:32 by david