| Connect unit to programming device. | Connect unit to programming device. | ||
| - | {{: | + | {{: |
| + | |||
| + | * Select STM32CubeProgrammer | ||
| + | * Connect to Unit | ||
| + | |||
| + | {{: | ||
| - | * Select Atmel studio | ||
| * Select Device programming | * Select Device programming | ||
| - | * Select required Fuses see pictures below. | ||
| - | {{: | + | {{: |
| + | |||
| + | * Browse and select the S:/ | ||
| + | |||
| + | {{: | ||
| + | |||
| + | * Click Start Programming Making sure all the checked boxes are correct | ||
| + | |||
| + | {{: | ||
| - | * Select Memories | + | You can now disconnect the unit, if programming unsucessful, |
| - | * Select Atmel Flip (select ATmeg4C1) | + | |
| - | {{: | + | * Open Monex and click 'Get Serial' |
| - | * Load Hex file (4291-v2.0.6.hex) | + | {{: |
| - | * Place magnet in position see picture below | + | |
| - | {{: | + | |
| - | * Select | + | * Go to the Programming tab and match the device instance to the Target |
| - | * Verify Flash | + | |
| - | {{: | + | {{: |
| + | |||
| + | * Click on 4291 and the Reprogram on the pop-up | ||
| + | * Select S:/ | ||
| + | |||
| + | {{: | ||
| + | |||
| + | * The Device should start programming and should ' | ||
| + | |||
| + | * Go Back to Device Info Tab and check that Model ID now shows as 4-20mA Tank Level Adapter | ||
| + | |||
| + | {{: | ||
| ====== Test Procedure ====== | ====== Test Procedure ====== | ||
| Line 40: | Line 58: | ||
| • At the start of testing DUT has to be in default configuration state.</ | • At the start of testing DUT has to be in default configuration state.</ | ||
| | | ||
| - | ===== Calibrating Sender | + | |
| + | |||
| **TEST EQUIPMENT USED** | **TEST EQUIPMENT USED** | ||
| * 4291 Sender | * 4291 Sender | ||
| * Flat Head Screwdriver | * Flat Head Screwdriver | ||
| - | * Hydrostatic Sensor | + | * 4-20mA Test Unit |
| * NMEA Network | * NMEA Network | ||
| - | * Calibrating Pipe on staircase (production side) | + | * Magnet |
| - | * CTS file if provided by customer | + | |
| === Step 1 === | === Step 1 === | ||
| + | * Power up the unit and check connection on Monex | ||
| + | * Connect the Test Box as shown in the picture below | ||
| - | Power on the NMEA power supply and set to 12V before turning on. | + | {{: |
| - | {{: | + | {{: |
| - | You will need an NMEA connector in the production staircase, and connect the 4291, the blue LED should be double blinking every few seconds. | + | === Step 2 === |
| - | Open Monex on your PC, click 'Get Serial' | + | * Begin by Empty Calibrating the Sender, do this by setting the Test box to 0 and Left Hex Switch to 'E' |
| - | <note important> | + | {{: |
| - | + | ||
| - | === 4 Configuration === | + | |
| - | The device is configured using the left hand rotary switch, labelled ' | + | |
| - | before use the unit must be calibrated to the sensor. | + | |
| - | + | ||
| - | === 4.1 Zero calibration === | + | |
| - | - Ensure that the trim sensor is in the zero (full down) position | + | |
| - | - Turn the ' | + | |
| - | - Hold a magnet over the label marking ' | + | |
| - | - The blue LED will light for 2 seconds. The zero position is now calibrated | + | |
| - | - Return the config switch to the 0 position | + | |
| - | + | ||
| - | === 4.2 100% Calibration === | + | |
| - | - Ensure that the trim sensor is in the 100% (full up) position | + | |
| - | - Turn the ' | + | |
| - | - Hold a magnet over the label marking ' | + | |
| - | - The blue LED will light for 2 seconds. The 100% position is now calibrated | + | |
| - | - Return the config switch to the 0 position | + | |
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | {{: | + | |
| - | + | ||
| - | === Step 2 === | + | |
| - | Connect the Hydrostatic sensor to the 4291 as shown: | + | |
| - | + | ||
| - | {{: | + | |
| === Step 3 === | === Step 3 === | ||
| - | Make sure the water Pipe is empty before connecting the hydrostatic sensor. | ||
| - | Open the Left valve on the staircase pipe and screw in the hydrostatic sensor, make sure it is level to the ground when taking readings | + | * Follow by Full Calibrating |
| - | {{: | + | {{: |
| - | + | ||
| - | Use the screwdriver and turn the left Hex switch to ' | + | |
| - | + | ||
| - | {{: | + | |
| - | + | ||
| - | {{: | + | |
| - | + | ||
| - | Check Monex to see that the sender is transmitting 0% | + | |
| === Step 4 === | === Step 4 === | ||
| - | Now proceed to fill the pipe on the staircase to the specified | + | * Open Monex and check that the fuel level shown matches |
| - | If 4671 then full calibration is at 4 metres. | + | Test Box 100 = 100% fuel |
| - | If 4670, 4672 or 4673 then full calibration is a 2 metres. | + | Test Box 50 = approximately 65% fuel |
| - | + | ||
| - | When the water level is at the full calibration level make sure the hydrostatic sensor is as horizontal as possible. | + | |
| - | + | ||
| - | Turn the left Hex switch to ' | + | |
| - | + | ||
| - | {{: | + | |
| - | + | ||
| - | Check Monex to see that the sender is transmitting 100%. | + | |
| + | Test Box 0 = 0% fuel | ||
| + | | ||
| === Step 5 === | === Step 5 === | ||
| - | On monex go into the Volumetric mode tab, click 'Read table from sender' | + | |
| + | * Now Cycle Through values 0-7 on the left switch and check if they match the Fluid Type on Monex (Shown below the fluid level Bar Graph) | ||
| - | {{: | + | 0 = Fuel |
| - | Now Drain the water slightly, and each time compare the water level to the monex output, in unsure then ask for help. | + | 1 = Fresh |
| - | If the readings are all within 1% of the real value then calibration is finished. | + | 2 = Grey |
| + | 3 = Live Well | ||
| + | 4 = Oil | ||
| - | **TEST EQUIPMENT USED** | + | 5 = Black |
| - | * • NMEA2000 Network with PCAN-View NMEA2000® USB Adaptor | + | 6 = Gasoline |
| - | + | 7 = Rsvd | |
| - | | + | |
| - | | + | |
| - | * • MONEX installed on a PC | + | |
| - | + | ||
| - | {{: | + | |
| - | + | ||
| - | {{: | + | |
| | | ||
| - | {{: | + | * Now Cycle Through values 0-F on the right switch and check if the value matches the Device Instance on Monex |
| - | Fit PCB to box – this will go either way round | + | ===== Fit PCB to box – this will go either way round ===== |
| - | {{: | + | {{: |
| - | Secure | + | <note warning> |
| - | Take care when fitting the spacer by the NMEA connector, as it may foul when fitting | + | < |
| - | + | The Adaptor is now ready for Labels, Connect | |
| - | {{: | + | |
| - | + | ||
| - | Fit top plate and screw down | + | |
| - | + | ||
| - | {{: | + | |
| - | + | ||
| - | < | + | |
| - | </ | + | |
| - | The screws must also be flush after fitting. | + | |
| - | + | ||
| - | {{: | + | |
| Fit top label | Fit top label | ||
| - | {{: | + | {{: |
| - | <note important> | + | |
| - | The Adaptor is now ready for Labels, Connect to monex for serial numbers</ | + | |
| ====== Manual Printing Instructions ====== | ====== Manual Printing Instructions ====== | ||
| Line 205: | Line 166: | ||
| * 1 x User Manual | * 1 x User Manual | ||
| - | {{: | + | {{: |
| - | + | ||
| - | + | ||
| - | ====== Manual Printing Instructions ====== | + | |
| - | + | ||
| - | - Go to (S) Drive. | + | |
| - | - Parts Documents. | + | |
| - | - Select 4291 | + | |
| - | - Select PDF' | + | |
| - | - Select 4291 user manual and print. | + | |
| - | + | ||
| - | ====== Label Printing Instructions ==== | + | |
| - | + | ||
| - | - Choose labels required | + | |
| - | - Select (LabelDirect) | + | |
| - | - Close (Pop Up) | + | |
| - | - Go to file-open | + | |
| - | - Select - Parts documents | + | |
| - | - Select - 4291 | + | |
| - | - Select - Labels | + | |
| - | - Select - UL_4291_A-2.0.4 | + | |
| - | - Highlight Serial number and change in Text box. | + | |
| - | - Go to Incrementing number Properties and change serial number. | + | |
| - | - Go to file -Print Setup | + | |
| - | - Select bradyBBP11-34L(copy 1) and select Calibrate. | + | |
| - | - label will calibrate. | + | |
| - | + | ||
| - | For the 4925 the above procedures are the same with different labels and manuals. | + | |
| - | + | ||
| - | --- // | + | |
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||
| - | + | ||